| |
||||
|
|
Unit Four - Drilling Methods Extrapolating: Estimate made from set of known values Plan Map: Map made by projection of information onto a horizontal plane. Different plan maps are made for different mine levels for underground mines. Geologic maps are a type of plan map where the geology is projected onto the horizontal plane corresponding to sea level. Arithmetic Mean: Values are summed and divided by the total number of values. Bisector: A straight line that bisects (halves) a line. Prism: A polyhedron with two faces that are polygons in a parallel planes, and the other faces are parallelograms or rectangles. Dilution: Waste that is not segregated from ore during mining, thus decreasing the grade of the ore and increasing the tons. Resource: The amount of a substance, or “endowment”, contained in a deposit and ultimately available for extraction and use.
Field Methods | Geochemical Methods | Geophyscial Methods | Drilling Methods | Petroleum Exploration |
||||||||||||||||